550.                  

20/12/2023

Darren Thomas

CA1878 Haverfordwest Footbridge & Western Quayside Phase 2 -

Additional Services – Website, FRAP, Procurement Activities and Discharge of Planning & Conservation Conditions

 

  • Atkins Rėalis

 

551.                  

19/12/2023

Darren Thomas

Invitation & Evaluation of a Tender for Ice Cream concessions at Lower Town Fishguard and Newgale car parks.

552.                  

05/01/2024

Darren Thomas

Notice of Decision by Head of Infrastructure and Environmental Services

 

  • Framework extension for the Provision of Waste Haulage Services

553.                  

09/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0079 – SAB

 

  • 2 No Detatched Dwellings

Bryngwyn

Bryn y Mor Lane

Fishguard

SA65 9DL

554.                  

12/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0083 – SAB

 

  • Replacement Dwelling

Herons Brook Golf and Fishing Retreat

Narberth

SA67 8BU

555.                  

15/01/2024

Darren Thomas

Director Decision –

 

Framework for Amenity Grass Cutting

 

556.                  

17/01/2024

Darren Thomas

Heart of Pembrokeshire: GOAL Asbestos Removal – Tender Approval

 

  • Shield Environmental Services

557.                  

12/01/2024

Darren Thomas

Highways Act 1980 Section Final Certificte

 

  • Residential Developent at Glasfryn Road St Davids

(Now referred to as Swn y Mor Bishops Court and Augusta Way St Davids)

558.                  

18/01/2024

Darren Thomas

Proposed Road Adoption

 

  • Swn y Mor Bishops Court and Augusta Way St Davids

559.                  

18/01/2024

Darren Thomas

Director Decision – Tender Award

 

  • Replacement of Pembroke Castle Pond Railings to Areas 1 and 2
  •  

560.                  

22/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0081 – SAB

 

  • New Dwelling

34 Church Road

Roch

Haverfordwest

SA62 6BG

561.                  

23/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0084 – SAB

 

  • Replacement Dwelling Building

Ty’r Hen Felin

Crymych

Pembrokeshire

SA41 3QY

 

562.                  

22/01/2024

Darren Thomas

Contract Award – Fan Road Active Travel Improvements – Phase 3

 

  • Evan Pritchard Ltd

 

563.                  

23/01/2024

Darren Thomas

Contract Award – CA1201 Westfield Pill Refurbishment including Parapet Replacement

 

  • Atkins

564.                  

24/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0082 – SAB

 

  • Proposed Storage Unit

Sunnyvale Caravan Park

Valley Road

Saundersfoot

SA69 9BP

 

565.                  

25/01/2024

Darren Thomas

Contract Award – AT Core – Slippery Back SUP – Scoping and Initial Feasibility for Alternative Route

 

  • Atkins

566.                  

26/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0075 – SAB - Refusal

 

  • Residential Development

Land South of Cleggars Park

Lamphey

SA71 5JY

567.                  

26/01/2024

Darren Thomas

Summary of Key Contract Procedure Rules

568.                  

30/01/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0087 – SAB

 

  • Caravan Pitches and Managers Accommodation

Llanungar Fach Caravan Park

Nine Wells

Solva

SA62 6FG

569.                  

30/01/2024

Darren Thomas

CA18006 S106 Keeston Walkling and Cycling Improvements

 

  • Arcadis

 

570.                  

31/01/2024

Darren Thomas

MHPTI – GRIPS Prep Works – Consultant Contract Award

 

  • Atkins Rėalis

571.                  

01/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0089 – SAB

 

  • Proposed Dwelling

Mount Rose Gardens

Cwmins

St Dogmaels

SA43 3HF

572.                  

29/01/2024

Darren Thomas

CA1878 Haverfordwest Footbridge & Western Quayside Phase 2

 

  • Atkins Rėalis

 

573.                  

02/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0090 – SAB

 

  • Proposed Commercial Development

Kingswood Industrial Estate

Pembroke Dock

          SA72 4RS

574.                  

02/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0086 – SAB

 

  • Expansion of Existing Caravan Site

Midland Uchaf

Letterston

          SA62 5TU

575.                  

06/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-0080 – SAB

 

  • 4 No. Semi Detached Dwellings

Land Adjacent to Cleddau Avenue

          Neyland

          Pembrokeshire

          SA73 1UE

 

576.                  

05/02/2024

Darren Thomas

CA18014 ATC Picton Place to Riverside Phase 2

 

Atkins Rėalis

577.                  

07/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-001 – SAB

 

  • Replacement Dwelling

Alaway House

Manorbier

Tenby

SA70 7TB

 

578.                  

07/02/2024

Darren Thomas

Consultant Contract Award Pembrokeshire E Bike Scheme

 

WSP

579.                  

14/02/2024

Darren Thomas

Director Decision

 

  • Invitation and Evaluation of Tender for 3.5T Cage Tippers

 

580.                  

16/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-004 – SAB

 

  • New Dwelling

Plot adjacent to White Park Cottage

The Ridgeway

Saundersfoot

SA69 9LA

581.                  

15/02/2024

Darren Thomas

Director Decision –

 

  • Procurement of 10 EV Vans

 

582.                  

19/02/2024

Darren Thomas

Highways Act 1980 – Section 38 Final Certificate

 

  • Thornton Road

Milford Haven (Phase 1 & 2)

 

583.                  

21/02/2024

Darren Thomas

On Street Parking Review – Variation 28 – Head of Service Consent to Proceed with Formal Advertising of Proposals

Furzy Park Haverfordwest – Prohibition of Waiting – Remove inconsiderate parking opposite junction.

Haverfordwest High School Access Road – Prohibition of Waiting – To remove parking on the access road.

Hall Court Johnston – Prohibition of waiting – To remove parking opposite new footway work.

C3030 – Milton - Prohibition of Waiting – To remove parking near the junction with A477(T) Traffic Island and on junction leading towards Chip Shop

Nun Street St Davids – Removal of small section of single yellow line across new housing development site – Existing restriction crosses over new entrance to housing site.

The Peebles St Davids – No wating 8am – 6pm - To prohibit parking during the day which restricts access to properties.

The Croft Tenby – Prohibition of waiting, loading and unloading at anytime – To remove parking on the junction.

Five Arches South Parade Tenby – Prohibition of waiting, loading and unloading at anytime – To remove indiscriminate parking around the Five Arches

 

584.                  

21/02/2024

Darren Thomas

Highways Act 1980 – Section 228 – Proposed Road Adoption

 

  • Isambard Gardens

Neyland

585.                  

23/02/2024

Darren Thomas

Director Decision –

 

  • Direct Award for the Appointment of Gibson Specialist Technical Services (GSTS) for the Replacement of Boilers in the Pembrokeshire Learning Centre  Neyland

 

586.                  

26/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-003 – SAB

 

  • Proposed New Track

Marloes Mere

Marloes

Pembrokeshire

SA62 3BH

 

587.                  

28/02/2024

Darren Thomas

Quality Price Model – Mini Competition of T11 Public Transport Route 2023

 

Richard Bros

588.                  

28/02/2024

Darren Thomas

Decision by Director

 

  • Direct Award for the Appointment ofGleeds Management Services for Multi Disciplinary Services for the Manorbier School Restoration and Remedial works

 

589.                  

29/02/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-005 – SAB

 

  • Construction of 2 Dwellings

Land adjacent Delfryn

Stop and Call

Goodwick

SA64 0EX

590.                  

04/03/2024

Darren Thomas

Decision By Director –

 

Direct Award for the Appointment of Aecom for Project Management and cost Consultancy Services fo the Ysgol Penrhyn Dewi Modular Project.

 

591.                  

04/03/2024

Darren Thomas

CA1883 ATC Pembroke Dock – Left Turn Lane & SUP Improvements

 

Evan Pritchard

592.                  

04/03/2024

Darren Thomas

Highways Streetcare and Harbour Fees Decision – 2024 – 2025

 

  1. Harbour fees – agree to increase: subject to any individual fee not being above the RPI index of 6.7%
  2. StreetCare – agree to the increase, as all are within the RPI index.
  3. Street Trading - fees are linked to Council decision to increase – I agree to uplift by inflation.

 

My rationale for this decision is:

a)     To ensure fees levels take into account RPI level of increase.

b)     To link with discussions and decisions relating to budget pressures and budget increases.

c)      To ensure that as far as practicable discretionary fees are cost recovery, and service areas with discretionary fees are not a burden on the base budget.

 

Streetcare fees

 

Short term

·        Application fee (one off) - £90-£96 (6.67%)

·        Trading fee - £18 (per day) - £19.20 (6.67%)

 

Medium Term

·        Application fee (one off) - £90-£96 (6.67%)

 

·        Trading fee - £793.00 (per period) - £846.00 (6.68%)

 

Long term

·        Application fee (one off) - £90-£96 (6.67%)

·        Trading fee - £1,609.00 (per period) £1716.00 (6.65%)

 

Market

·        Application fee (one off) - £90-£96 (6.67%)

·        Trading fee - £793.00 (annual) £846 (6.68%)

 

Occasional

·        Application fee (one off) - £10 - £10.60 6%

·        Trading fee - £40.00 (per day) £42.50 (6.25%)

 

Mobile vendor

·        Application fee (one off) - £90.00 £96.00 (6.67%)

·        Trading fee - £150.00 (annual) £160.00 (6.67%)

 

Café Culture

Tenby (during the Pedestrianisation scheme) - £150.00 fixed fee - £160 (6.67%)

Any other location (12 months)

·        £15.75 per chair -£16.75 (6.3%)

£31.50 per table fixed fee - £33.60 (6.67%)

 

Highways Fees

 

 

Installation of Apparatus up to 1 Building

2023-24: 560

2024-25: 597.52

2024-25 rounded:597.50

Increase £:37.50

Increase %: 6.70%

No. of Annual Transactions: 30 

Rounded Yield £1,125

 

Installation of Apparatus more than 2 Buildings

 

2023-24: 560

2024-25: 597.52

2024-25 rounded: 597.50

Increase £: 37.50

Increase %: 6.70%

No. of Annual Transactions: 30      

Rounded Yield £1,125

 

Repair/Renew/ Maintain existing apparatus without Licence

 

2023-24: 449

2024-25: 479.08

2024-25 rounded:479.00

Increase £:30.00

Increase %: 6.68%

No. of Annual Transactions:0

Rounded Yield £0

 

Repair/Renew/ Maintain existing apparatus with Licence

 

2023-24: 330

2024-25: 352.11

2024-25 rounded: 352.00

Increase £:22.00

Increase %: 6.67%

No. of Annual Transactions: 0

Rounded Yield £0

 

 

Installation of a Noticeboard

 

2023-24: 185

2024-25: 197.40

2024-25 rounded: 197.00

Increase £:12.00

Increase %:6.49%

No. of Annual Transactions:10

Rounded Yield £: £120

 

Potential yield

Increase: 6.65%

Rounded yield: £2,370

 

 

Skips

 

2023-24:  55

2024-25: 58.69

2024-25 rounded: 58.50

Increase £:3.50

Increase %:6.36%         

No. of Annual Transactions: 323

Rounded Yield £:£1,131

 

 

Scaffolding

 

2023-24: 70

2024-25: 74.69

2024-25 rounded:74.50

Increase £:4.50

Increase %:6.43%

No. of Annual Transactions:240

Rounded Yield £: £1,080

 

 

Hoarding or fence

 

2023-24: 86.5

2024-25: 92.30

2024-25 rounded: 92.00

Increase £:5.50

Increase %:6.36%

No. of Annual Transactions: 10 

Rounded Yield £55

 

Hoarding or Fence – Supervision

 

2023-24: 63

2024-25: 67.22

2024-25 rounded:67.00

Increase £:4.00

Increase %:6.35%

No. of Annual Transactions:10

Rounded Yield £40

 

 

Vehicular Crossing

 

2023-24: 170

2024-25: 181.39

2024-25 rounded:181.30

Increase £:11.30

Increase %:6.65%

No. of Annual Transactions:115

Rounded Yield £:£1,300

 

 

Vehicular Crossing (Additional)

 

2023-24: 230.5

2024-25: 245.94

2024-25 rounded: 245.50

Increase £: 15.00

Increase %: 6.51%

No. of Annual Transactions: 36

Rounded Yield £540

 

Temporary Excavations

 

2023-24: 465

2024-25: 496.16

2024-25 rounded: 496.00

Increase £: 31.00

Increase %: 6.67%

No. of Annual Transactions: 7

Rounded Yield £217

 

Potential yield

 

Increase: 6.47%

Rounded yield: £4362

 

 

 

Harbour Fees

 

 

2022-23: £7.50

2023-24: £8.50

Increase: £9.07

Rounded: £9.00

% increase: 5.88%

2024-25 final: 9.00

 

2022-23: £10.00

2023-24: £11.00

Increase: £11.74

Rounded: £11.70

% increase: 6.36%

2024-25 final: 11.70

 

2022-23: £17.00

2023-24: £19.00

Increase: £20.27

Rounded: £20.20

% increase: 6.32%

2024-25 final: 20.20

 

2022-23: £81.50

2023-24: £90.00

Increase: £96.03

Rounded: £96.00

% increase: 6.67%

2024-25 final: 96.00

 

2022-23: £12.00

2023-24: £13.00

Increase: £13.87

Rounded: £13.80

% increase: 6.15%

2024-25 final: 13.80

 

2022-23: £2.00

2023-24: £2.00

Increase: £2.13

Rounded: £2.00

% increase: 0.00%

2024-25 final: 2.10

 

2022-23: £475.00

2023-24: £523.00

Increase: £558.04

Rounded: £558.00

% increase: 6.69%

2024-25 final: 558.00

 

2022-23: £742.00

2023-24: £817.00

Increase: £871.74

Rounded: £871.70

% increase: 6.70%

2024-25 final: 871.70

 

2022-23: £16.50

2023-24: £18.00

Increase: £19.21

Rounded: £19.00

% increase5.56%

2024-25 final: 19.20

 

2022-23: £12.00

2023-24: £13.00

Increase: £13.87

Rounded: £14.00

% increase: 7.69%

2024-25 final: 13.80

 

2022-23: £26.00

2023-24: £29.00

Increase: £30.94

Rounded: £31.00

% increase: 6.90%

2024-25 final: 30.90

 

2022-23: £21.50

2023-24: £24.00

Increase: £25.61

Rounded: £26.00

% increase: 8.33%

2024-25 final: 25.60

 

 

 

2022-23: £29.00

2023-24: £32.00

Increase: £34.14

Rounded: £34.00

% increase: 6.25%

2024-25 final: 34.10

 

2022-23: £135.00

2023-24: £149.00

Increase: £158.98

Rounded: £159.00

% increase: 6.71%

2024-25 final: 158.90

 

2022-23: £101.50

2023-24: £123.00

Increase: £131.24

Rounded: £131.00

% increase: 6.50%

2024-25 final: 131.20

 

2022-23: £279.00

2023-24: £307.00

Increase: £327.57

Rounded: £328.00

% increase: 6.84%

2024-25 final: 327.50

 

2022-23: £319.00

2023-24: £351.00

Increase: £374.52

Rounded: £374.50

% increase: 6.70%

2024-25 final: 374.50

 

2022-23: £356.50

2023-24: £392.50

Increase: £418.80

Rounded: £419.00

% increase: 6.75%

2024-25 final: 418.80

 

2022-23: £408.00

2023-24: £449.00

Increase: £479.08

Rounded: £479.00

% increase: 6.68%

2024-25 final: 479.00

 

2022-23: £537.00

2023-24: £591.00

Increase: £630.60

Rounded: £630.50

% increase: 6.68%

2024-25 final: 630.60

 

2022-23: £596.00

2023-24: £656.00

Increase: £699.95

Rounded: £700.00

% increase: 6.71%

2024-25 final: 699.90

 

2022-23: £449.00

2023-24: £494.00

Increase: £527.10

Rounded: £527.00

% increase: 6.68%

2024-25 final: 527.10

 

2022-23: £531.50

2023-24: £585.00

Increase: £624.20

Rounded: £624.00

% increase: 6.67%

2024-25 final: 624.20

 

2022-23: £827.00

2023-24: £911.00

Increase: £972.04

Rounded: £972.00

% increase: 6.70%

2024-25 final: 972.00

 

2022-23: £1,144.00

2023-24: £1,260.00

Increase: £1,344.42

Rounded: £1,344.00

% increase: 6.67%

2024-25 final: 1344.40

 

2022-23: £1,642.00

2023-24: £1,808.00

Increase: £1,929.14

Rounded: £1,929.00

% increase: 6.69%

2024-25 final: 1929.10

 

2022-23: £1,903.00

2023-24: £2,095.00

Increase: £2,235.37

Rounded: £2,235.00

% increase: 6.68%

2024-25 final: 2235.30

 

2022-23: £26.00

2023-24: £29.00

Increase: £30.94

Rounded: £31.00

% increase: 6.90%

2024-25 final: 30.90

 

2022-23: 1715.67

2023-24: £1,889.00

Increase: £2,015.56

Rounded: £2,015.50

% increase: 6.70%

2024-25 final: 2015.50

 

2022-23: £82.00 per vessel

2023-24: £90.00 per vessel

Increase: £96.03

Rounded: £96.00

% increase:6.67%

2024-25 final: 96.00

 

2022-23: £145.00 per vessel

2023-24: £160.00 per vessel

Increase: £170.72

Rounded: £170.50

% increase: 6.56%

2024-25 final: 170.70

 

2022-23: £203.00 per vessel

2023-24: £223.50 per vessel

Increase: £238.47

Rounded: £238.50

% increase: 6.71%

2024-25 final: 238.40

 

2022-23: £279.00 per vessel

2023-24: £307.00 per vessel

Increase: £327.57

Rounded: £327.50

% increase: 6.68%

2024-25 final: 327.50

 

2022-23: £348.00 per vessel

2023-24: £383.00 per vessel

Increase: £408.66

Rounded: £408.50

% increase: 6.66%

2024-25 final: 408.60

 

2022-23: Ychwanegol £58

2023-24: Ychwanegol £64

Increase: £68.29

Rounded: £68.00

% increase: 6.25%

2024-25 final: 68.20

 

2022-23: £28.00 per vessel

2023-24: £31.00 per vessel

Increase: £33.08

Rounded: £33.00

% increase: 6.45%

2024-25 final: 33.00

 

2022-23: £75.00 per season

2023-24: £83.00 per season

Increase: £88.56

Rounded: £88.50

% increase: 6.63%

2024-25 final: 88.50

 

2022-23: £6.50 per metre length overall

2023-24:£7.00 per metre (length overall)

Increase: £7.47

Rounded: £7.50

% increase: 7.14%

2024-25 final: 7.40

 

2022-23: £16.00 per metre (Length overall)

2023-24: £18.00 per metre (Length overall)

Increase: £19.21

Rounded: £19.00

% increase:11.11%

2024-25 final: 19.20

 

2022-23: £7.50

2023-24: £8.50

Increase: £9.07

Rounded: £9.00

% increase: 5.88%

2024-25 final: 9.00

 

2022-23: £44.00

2023-24: £48.50

Increase: £51.75

Rounded: £52.00

% increase: 7.22%

2024-25 final: 51.70

 

2022-23: £18.50

2023-24: £20.50

Increase: £21.87

Rounded: £22.00

% increase:7.32%

2024-25 final: 21.80

 

2022-23: £4.00

2023-24: £4.50

Increase: £4.80

Rounded: £5.00

% increase: 11.11%

2024-25 final: £4.80

 

2022-23: £1.00

2023-24: £1.00

Increase: £1.07

Rounded: £1.00

% increase:7.22%

2024-25 final: £1.00

 

2022-23: £232.00

2023-24: £255.50

Increase: £272.62

Rounded: £272.50

% increase: 6.65%

2024-25 final: 272.60

 

2022-23: £1.00

2023-24: £1.00

Increase: £1.07

Rounded: £1.00

% increase: 0.00%

2024-25 final: 1.00

 

2022-23: £12.00

2023-24: £13.00

Increase: £13.87

Rounded: £14.00

% increase:7.69%

2024-25 final: 13.80

 

2022-23: £16.50 per tonne for mooring holder

2023-24: £18.50 per tonne for mooring holder

Increase: £19.74

Rounded: £20.00

% increase: 8.11%

2024-25 final: 19.70

 

2022-23: £18.00 per tonne for non-mooring holder

2023-24: £18.00 per tonne for non-mooring holder

Increase: £19.21

Rounded: £19.00

% increase:5.56%

2024-25 final: 19.20

 

593.                  

05/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-0006 – SAB

 

  • Construction of 2 New Dwellings

Fishguard & Goodwick Railway Mens Club

Brodog Terrace

Fishguard

SA65 9NP

594.                  

06/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-0007 – SAB

 

  • Construction of Extenson and Garage

The Bungalow

Cresselly

SA68 0SN

595.                  

08/03/2024

Darren Thomas

Director Decision

 

  • Procurement of 4.7 Tonne pick ups

 

596.                  

12/03/2024

Darren Thomas

Decision by Head of Infrastructure

 

  • To invite and evaluate a tender for the Wisemans Bridge Cliff Failure Repair

 

597.                  

13/03/2024

Darren Thomas

Director Decision

 

Framework for Traffic Management Services

598.                  

12/03/2024

Darren Thomas

Decision by Head of Infrastructure & Environment

 

Tender for a Public Art Piece in Haverfordwest

599.                  

13/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-0007 – SAB

 

  • Construction of New Dwelling

Plot 2 Kiln Park

Burton

SA73 1NY

 

600.                  

18/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-0002 – SAB

 

  • Detached Dwelling

Trewilym Uchaf

Eglwyswrw

Pembrokeshire

SA41 3PY                   

 

601.                  

18/03/2024

Darren Thomas

Decision By Head of Infrastructure and Environment

 

  • To Routeware (Webaspex) via G Cloud for Environmental Waste and Re-cycling In-cab technology

 

602.                  

19/03/2024

Darren Thomas

Highways Act 1980 – Section 38 Final Certificate

 

  • Residential Development at Maesgwynne Fishguard – now known as Parc Loktudi Fishguard

 

603.                  

20/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 010 – SAB

  • Proposed Cattle Housing Shed

Penrhiw Farm

Cilgwyn

Newport

SA42 0QH

604.                  

02/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 23-085 – SAB

 

  • Proposed Barn Conversion

Brachers Cottage

Lambston

Haverfordwest

SA62 3LR

605.                  

04/04/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-011 – SAB

 

  • Residential Building

Tar Cottage

Black Tar

Llangwm

SA62 4HN

 

606.                  

28/03/2024

Darren Thomas

Director Decision

 

  • WP4 – Conversation of Haverfordwest Gaol to Visitor attraction as part of the HOP Scheme

 

607.                  

28/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-009 – SAB

 

  • 2 Proposed Holiday Cottages

Brynderwen

Cwmins

St Dogmaels

SA43 3HF

608.                  

28/03/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24-014 – SAB

 

  • Residential Building

34 Church Road

          Roch

          SA62 6BG

609.                  

28/03/2024

Darren Thomas

Notice of Decision by Head of Infrastructure and Environment

 

  • WP3 – Conversation of Haverfordwest Castle Walls – Survey of Ground to Queen Eleanor’s Garden

 

610.                  

09/04/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 013 – SAB

 

  • Detached Dwelling & Garage

6 The Grove

Pembroke

SA71 5BP

 

611.                  

10/04/2024

Darren Thomas

Ordinary Watercourse Consent

 

  • Beddoes Court

Saundersfoot

 

612.                  

10/04/2024

Darren Thomas

Highways Act 1980 – Section 38 Final Certificate

 

  • Residential Development at Old Infants School Site off Charles Street (now known as Isambard Gardens Neyland)

 

613.                  

21/03/2024

Darren Thomas

Amended Director Decision

 

  • Education Transport Extension

 

614.                  

02/04/2024

Darren Thomas

The County of Pembroke (Various Roads) (Speed Limits) Amalgamation Order 2023 (Amendment No 1) Order 2024

 

  1. Buffer limits on various A & B Class roads on the approach to the settlements to support the recently introduced 20mph limits or to provide a short connecting limit between settlements.
  2. To reduce the speed of traffic entering/leaving settlements and result in a smoother transition between the area of national speed limit and the lower limits within the settlements.
  3. To amend any discrepancy in respect of the position of new 20mph/settlement/terminal signs recently installed.

4,       Feedback from informal conversation with PS Sara John from the Serious Collision Investigation Unit re Newgale Collision which asked us to consider a buffer limit in light of serious incident that had occurred at the campsite.

615.                  

11/04/2024

Darren Thomas

Ordinary Watercourse Consent –

 

  • Land Adjacent Waterloo Road Pembroke Dock

 

616.                  

16/04/2024

Darren Thomas

Ordinary Watercourse Consent –

 

Ffynnon Wen  Dinas Wen

617.                  

17/04/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 016 – SAB

 

  • Pembroke Synchronous Condenser

Pembroke Power Station

Pembroke

SA71 5SS

 

618.                  

25/04/2024

Darren Thomas

Highways Harbour Fees Updated Decision – 2024 – 2025

Harbours*              

Harbours Charges   2023-24        2024-25

Tenby Harbour + VAT at Standard Rate                    

Private Visiting Craft (without moorings)                    

Sailing Dinghies                

Under 4.25m – Daily Rate  £8.50  £9.00

Over 4.25m   – Daily Rate  £11.00          £11.70

Weekly Rate - Pro Rata               

                          Twin hull vessels x 2                    

Other Private visiting craft (without moorings)               

Daily – All vessels   £19.00          £20.20

Weekly Rate - Pro Rata               

                          Twin hull vessels x 2                    

Weekly (or part of)  – with moorings          £90.00          £96.00

Launching fee                   

Sailing per day        £13.00          £13.80

Motorised per day   £13.00          £13.80

Non-powered craft, kayaks, sailboards, etc.     £2.00  £2.10

Registered fishing boat with moorings -                      

rod and line max 6 metres £523.00          £558.00

Inshore/trawler>6 metres   £817.00          £871.70

Loading vessels – entry per day          £18.00          £19.20

Urgent overnight stays                 

Base Level    £13.00          £13.80

                     

Use of Boat Grid               

Boat grid per boat per tide £29.00          £30.90

Laying up fee                     

All vessels per metre         £24.00          £25.60

Private Boats Storage Ashore                 

Dinghy park etc. per metre per season including trolley/trailer (twin hulls x2)          £32.00          £34.10

Minimum charge     £149.00          £158.90

Punt Racks - per season    £123.00          £131.20

Kayak Storage - per season          £123.00        £131.20

Moorings                

Private boats with moorings per vessel          £307.00        £327.50

Harbour mooring:              

Row 1 £307.00        £327.50

Row 2 £351.00        £374.50

Row 3 £392.50        £418.80

Row 4 £449.00        £479.00

Row 5 £591.00        £630.60

Row 6 £656.00        £699.90

Licensed Commercial Passenger Boats                    

0-5 person per season       £494.00          £527.10

6-25 persons per season   £585.00          £624.20

26 - 50 per persons per season          £911.00        £972.00

51 - 75 per persons per season          £1,260.00     £1,344.40

76 - 100 per person per season          £1,808.00     £1,929.10

100 + per persons per season          £2,095.00     £2,235.30

Stand Licence fee per passenger per seat per season      £29.00          £30.90

Contract Mooring – Range Safety          £1,889.00     £2,015.50

Base Level              

                   

                   

Fishguard Harbour + VAT at Standard Rate   2023-24        2023-24

Mooring Licence Fees                 

Vessels up to 3.99m          £90.00 per vessel £96.00 per vessel

Vessels from 4m to 5.99m £160.00 per vessel £170.70 per vessel

Vessels from 6m to 7.99m £223.50 per vessel £238.40 per vessel

Vessels from 8m to 9.99m £307.00 per vessel £327.50 per vessel

Vessels 10m and above     £383.00 per vessel £408.60 per vessel

Registered Fishing vessels with a moorning      Additional £64.00          Additional £68.20

Tenders Permit       £31.00 per vessel          £33.00 per vessel

Outer Mooring Licence Fee per moorning      £83.00 per season          £88.50 per season

Vessels Laid up Ashore               

Winter charges - 1 October - 31 March          £7.00 per metre      £7.40 per metre

          (Length overall)       (Length overall)

Summer charges - 1 April - 30 September    £18.00 per metre          £19.20 per metre

          (Length overall)       (Length overall)

Visitors                   

Visiting non-commercial powered  craft / sailing dinghies / yachts brought into the harbour - per 24hrs      £8.50  £9.00

Visiting non-commercial powered  craft / sailing dinghies / yachts brought into the harbour – per week      £48.50          £51.70

Visiting registered fishing vessels per day     £20.50          £21.80

Launching of sailing dinghies,      £4.50          £4.80

powered craft or day sailing boats - per day              

Launching of non-powered craft,  £1.00          £1.00

paddleboards, kayaks, windsurfers, etc. – per day               

Commercial Operations               

Annual permit for a commercial operator to access, launch and operate in or from the harbour at any time (without additional charge) per annum          £255.50        £272.60

Alternative Daily charge to access, launch and operate in or from the harbour, per person on the water in or on a non-powered craft as customers of a commercial operation – per day £1.00          £1.00

Daily charge for powered craft, sailing dinghies or yachts (which are not a mooring holder) in commercial user to access, launch and operate in or from the harbour – per day        £13.00          £13.80

                     

Whelking – Restrictions during peak season May – September – must land outside core hours of 10.00 – 18.00, except by written permission of the harbourmaster.  Must have a banksman for vehicle movements.      £18.50 per tonne for mooring holder    £19.70 per tonne for mooring holder

          £18.00 per tonne for non-mooring holder        £21.00 per tonne for non-mooring holder

 

619.                  

30/04/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 017 – SAB

 

  • Alterations to Outbuildings & Parking Area

Panteurig

Pencaer

Goodwick

SA64 0JQ

620.                  

07/05/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 020 – SAB

 

  • Visitor Parking Area

West Ford Farm

Wolfscastle

Pembrokeshire

SA62 5PA

621.                  

13/05/2024

Darren Thomas

Director Decision - Real Passenger Transport Information System

 

JMW Systems Ltd

622.                  

10/05/2024

Darren Thomas

Decision by Head of Infrastructure and Environment Services

 

Extension option for the Operation and Maintenance of Public Conveniences throughout Pembrokeshire

623.                  

10/05/2024

Darren Thomas

Director Decision

 

Mechanical Verge Mowing Framework Extension

624.                  

14/05/2024

Darren Thomas

Notice of Decision by Head of Infrastructure & Environment

 

Extension option for the Provision of Beach Cleaning within Pembrokeshire

625.                  

15/05/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 024 – SAB

 

  • Horticultural Shed and Greenhouse

Gilton Lane Farm

Little Haven

Pembrokeshire

SA62 3TX

626.                  

13/05/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 018 – SAB

 

  • Residential Building

Glenfields Road

Haverfordwest

SA62 5PA

 

627.                  

17/04/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 022 – SAB

 

  • Construction of 2 No Agricultural Buildings

Clynfyw Farm

Abercych

Boncath

SA77 0HF

628.                  

20/05/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 015 – SAB

 

  • Car Park and Bin Store

Llain Las

          Heol Glyndwr

          Fishguard

          SA62 6BG

629.                  

21/05/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 012 – SAB

 

  • Replacement Dwelling

Dymani

Pen-y-Bryn

Pembrokeshire

SA43 2RX

630.                  

-

Darren Thomas

  • Residential Building

Plot 15

Bro’r Dderwen

Clynderwen

SA66 7NR

631.                  

24/05/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 028 – SAB

 

  • Residential Building

Plot 40

Bro’r Dderwen

Clynderwen

SA66 7NR

632.                  

03/06/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 025 – SAB

 

  • 5 Bedroom House and Swimming Pool

          Lower North Farm

          Treffgarne

          SA62 5YL

633.                  

31/05/2024

Darren Thomas

Asbestos Removal Tender

 

  • Maes Ingli

Newport

Pembrokeshire

634.                  

05/06/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 029 – SAB

 

  • New Managers Bungalow

St Ishmaels Garden Centre

St Ishmaels

Pembrokeshire

SA62 3SX

635.                  

03/06/2024

Darren Thomas

Exception Report

  • Cleddau Bridge Gantries

Principal Inspection

636.                  

07/06/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 021 – SAB

 

  • Seaweed and Seafood Processing Complex

Car y Mor

Clegyr Uchaf

St Davids

SA62 6QN

637.                  

07/06/2024

Darren Thomas

Director Decision

 

Procurement of EV Vans

638.                  

11/06/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 030 – SAB

  • Primary School and Respite Centre

Portfield School

Haverfordwest

SA61 1BS

639.                  

13/06/2024

Darren Thomas

DAT Exception Report for WP4

Archaeological watching Brief

640.                  

17/06/2024

Darren Thomas

Ordinary Watercourse Consent

 

  • Caroline Grove

Stackpole             

641.                  

21/06/2024

Darren Thomas

New Traffic Regulation Order

 

The County of Pembroke (Welsh Medium School Access Road Pembroke) (One Way Traffic (Except Pedal Cycles) & Prohibition of Left and Right (A4139 Bush Hill)

642.                  

18/06/2024

Darren Thomas

Ordinary Watercourse Consent

 

Colby Estate Woodlands

643.                  

21/06/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 019 – SAB

Changes to Touring and Static Caravan Pitches

Shearwater Retreat Holiday Park

Sardis

Kilgetty

SA67 8JX

644.                  

25/06/2024

Darren Thomas

Director Decision

Procurement of Trade Waste Refuse Vehicles

645.

01/07/2024

Darren Thomas

Proposed Road Adoption

Church Close

Begelly (Phase 2)

Pembrokeshire

646.

 02/07/2024

 Darren Thomas

 SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 031 – SAB

Residential Development

Land off Maes y Ffynnon

Pilgrims Way

Roch

SA62 6AJ

647.

03/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 034 – SAB

New Forestry Track

Benton Wood

Houghton

Burton

SA73 1PE

648.

04/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 039 – SAB

Accommodation/Home Office

Victoria House

Stepaside

SA67 8JS

649.

04/07/2024

Darren Thomas

Duty Holder Decision

IR 14 & 15

650.

09/07/2024

Darren Thomas

Agricultural shed

Land off Crow Hill

Haverfordwest

SA61 2HA

651.

08/07/2024

Darren Thomas

SRIC Narberth – Safe Routes for Schools Narberth Jesse Road – Phase 2 – Permission to Award

 

652.

11/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 041 – SAB

6 Plot Housing Development

Dyffryn Nurseries

Manor Way

Goodwick

SA64 0AE

653.

12/07/2024

Darren Thomas

Director Decision

Procurement of 5 x 3.5T Cage Tippers

654.

12/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 038 – SAB

Roof over Manure Store

South Astridge Farm

Tenby

SA70 8RE

655.

16//07/2024

Darren Thomas

Highways Act 1980 – Section 38 Final Certificate

Residential Development at Victoria Gardens Johnston

656.

16//07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 037 – SAB

Extension and Double Garage

2 Alban Crescent

Waterston

Pembrokeshire

SA73 1DY

657.

16//07/2024

Darren Thomas

S106 Heatherton Signage Works – Approval

Evan Pritchard Ltd

       

658.

18/07/2024

Darren Thomas

(Prohibition and Restriction of Waiting and Loading and Parking Places) (Consolidation) Order 2011 (Variation No 30) Order 2024

Statement of Reason

The proposals to introduce or amend on street parking restrictions as contained in the Draft Order are being promoted as part of the Council’s continual review of on street parking provision on the County road network.

This Order has been proposed as part of the pilot scheme ‘disabled person’s parking places’. The purpose of the scheme is to provide parking places located as near to a property as practical to help disabled people whose mobility impairment is such that they cannot walk any significant distance.

A bay may also be provided if the applicant’s disability means they cannot be left alone even for a brief period, and as a consequence must receive constant supervision. Each applicant has applied to the scheme and provided evidence to support their application.

Each applicant who meets the required criteria within the guidance ‘Provision of Individual Disabled Parking Places in Pembrokeshire 2021’, which has been set by the Council, is entitled to one bay for one nominated vehicle. No vehicle other than the applicant’s or their nominated driver’s will be permitted to park within the dedicated bay.

The installation of the bay is considered necessary to improve quality of living for those the bays are intended for.

 Schedule

1) Haverfordwest

1.1 Disabled Resident Permit Bay

Barn Street

Eastside - From the boundary of property Nos. 12 & 14 Barn Street southward for 6 metres.

 

Barn Street

South Eastside - from the boundary of property Nos. 38 & 40 Barn Street southward for 6 metres.

 

Cawdor Place.

North Eastside - From a point 6.7 m south east of the boundary of property No. 7 & 9 to a point 6 metres further south east.

 

2)  Fishguard

 

2.1 Disabled Resident Permit Bay

Morfa Las

Southside – from a point 5 metres east of Mansfield Street junction east for 6 metres.

3) Milford Haven

 

3.1 Disabled Resident Permit Bay

Starbuck Road

Eastside - from the boundary of property Nos. 9 & 11 Starbuck Road to a point 6 metres southwest.

 

Trafalgar Road

Southside – from a point 42 metres west of the junction with Priory Road, extending west for 6 metres.

 

4) Pembroke

4.1 Disabled Resident Permit Bay

Paynter Street

Eastside - from a point 1.6 metres north of the boundary between property No. 4 & 6 Northward for 5.8 metres.

 

Eastback

Northside - from the boundary of property Nos. 11 & Pembroke Antique Centre westward for 6 metres.

 

659.

22/07/2024

Darren Thomas

CA1892 - ATC Saundersfoot Station to Saundersfoot Village – Incline Way

  •  Evan Pritchard

660.

25/07/2024

Darren Thomas

CA1954 – SRIC Narberth – Safe Routes for Schools Narberth – Jesse Road – Phase 1

  •  Evan Pritchard

661.

26/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 023 – SAB

  •  Barn Conversions

South Nolton

Nolton

Haverfordwest

SA62 3HJ

662.

29/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 023 – SAB

  •  Highway Works A40 Llanddewl Velfrey Bethel Chapel Roundabout Pembrokeshire

663.

30/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 047 – SAB

  • Barn Conversion

Rookwood

Llandeloy

Pembrokeshire

SA62 6LP

664.

30/07/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 040 – SAB

  •  Traveller Pitch

Pen-y-Bryn

Keeston Lane

Keeston

Pembrokeshire

SA62 6HN

665.

02/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 033 – SAB

  •  Replacement Dwelling

Maesgwyn

Boncath

Pembrokeshire

SA37 0JF

666.

06/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 033 – SAB

  •  Off Street Parking

131 Castle Way

Dale

Pembrokeshire

SA62 3RN

667.

06/08/2024

Darren Thomas

Highways Act 1980 – Section 38 Final Certificate

  •  Development South of Picton Terrace Clarbeston Road

(now known as Orton Park Clarbeston Road)

 

668.

05/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 043 – SAB

  •  One Planet Development

Broad Oak

Martletwy

Narberth

SA67 8AW

669.

08/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 045 – SAB

  •  Proposed New Paint Shed

Valero Oil Terminal

Waterston Road

Waterston

Milford Haven

SA70 8RE

670.

09/08/2024

Darren Thomas

Route 696 Award

  •  Matts Cabbs

671.

09/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 046 – SAB

  •  New Surfacing

Haverfordwest Castle

Castle Street

Haverfordwest

SA61 2EF

672.

12/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 048 – SAB

  •  Permeable Paving

Ysgol Bro Gwaun

     Fishguard

     SA65 9DR

673.

12/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 026 – SAB

  •  Agricultural Building

Wiston Grange

Llawhaden

SA67 8DY

674.

13/08/2024

Darren Thomas

Proposed Prohibition of Motor Vehicles except for Access

  •  Heol Dyfed

Fishguard

675.

 14/08/2024

 Darren Thomas

 SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 051 – SAB

  •  New Dwelling

Redhill Farm

Narberth

Pembrokeshire

SA67 8QZ

676.

13/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 052 – SAB

  •  3G Pitch for Haverfordwest County AFC

Bridge Meadow Lane

Haverfordwest

SA61 2EX

677.

16/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 053 – SAB

  •  Proposed New Footway

Jesse Road

Narberth

SA67 7FE

678.

19/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 054 – SAB

  •  Mixed Residential and Commercial Unit

Former Garage Site

Quay Street

Lower Town

Fishguard

SA65 9NB

679.

19/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 056 – SAB

  •  Haverfordwest Transport Interchange

Cartlett Road

Haverfordwest

SA61 2LJ

680.

21/08/2024

Darren Thomas

Decision by Head of Infrastructure and Environmental Services

  •  Direct Award via Lot 5 of the ESPO Framework Agreement for Consultancy Services – Cardi Bach

681.

19/08/2024

Darren Thomas

Exception Report

  •  Morclean Pod Wash

 

682.

22/08/2024

Darren Thomas

Decision of Head of Infrastructure and Environmental Services

  •  Contract Extension for the Provision of a licensed facility to receive, recycle street sweepings and gulley waste

683.

29/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 050 – SAB

  •  Residential Development

Station Road

Kilgetty

SA68 0XR

684.

27/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 088 – SAB

  •  Residential Development

Sandyhill

Saundersfoot

Pembrokeshire

 

685.

27/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 063 – SAB

  •  Greenhill ATP Refurbishment

Greenhill School

Heywood Lane

Tenby

SA70 8BN

686.

10/09/2024

Darren Thomas

PCC (Prohibition and Restriction of Waiting and Loading and Parking Places) (Consolidation) Order 2011 (Variation No. 30) Order 2024

 

Schedule 8.8 (Disabled Resident Permit Bay),

1) Haverfordwest

 

1.1  Disabled Resident Permit Bay

Barn Street

EASTSIDE - From the boundary of property Nos. 12 & 14 Barn Street southward for 6 metres.

Cawdor Place

NORTH EASTSIDE - From a point 6.7 m south east of the boundary of property No. 7 & 9 to a point 6 metres further south east.

Trafalgar Road

NORTHSIDE - from point 44m northeast of the centreline junction with Harrier Road.

Extending northeast for 6m adjacent to the existing kerbline.

2)  Fishguard

 

2.1 Disabled Resident Permit Bay

Morfa Las

WESTSIDE – from the boundary of property Nos. 19 & 21 Morfa Las southward for 6 metres.

3) Milford Haven

 

3.1 Disabled Resident Permit Bay

Brooke Avenue

EASTSIDE - from a point 5 metres south east of the alleyway adjacent to property No. 12 Brooke Avenue to a point 6 metres further south east.

Brooke Avenue

WESTSIDE - from the boundary of property No. 5 & 7 southward for 6 metres.

Starbuck Road

EASTSIDE - from the boundary of property Nos. 9 & 11 Starbuck Road to a point 6 metres southwest.

Trafalgar Road

SOUTHSIDE – from a point 42 metres west of the junction with Priory Road, extending west for 6 metres.

 

4) Pembroke

 

4.1 Disabled Resident Permit Bay

Paynter Street

 

EASTSIDE - from a point 1.6 metres north of the boundary between property No. 4 & 6 Northward for 5.8 metres.

Eastback

NORTHSIDE - from the boundary of property Nos. 11 & Pembroke Antique Centre westward for 6 metres.

687.

03/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 055 – SAB

  •  Reprofiling Southern Face

Carew Quarry

Carew Newton

Pembrokeshire

SA70 8SN

688.

05/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 059 – SAB

  •  Renovation of Farmhouse and Outbuildings

Parsonage Farm

Amroth

Pembrokeshire

SA67 8PR

689.

04/09/2024

Darren Thomas

Decision By Head of Infrastructure and Environment

  •  Passenger and Travel Training Project

690.

05/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 060 – SAB

  •  Replacement Dwelling

Gwynfa

Rhosfach

Clynderwen

SA66 7JS

691.

29/08/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 062 – SAB

  •  New Dwelling

Llandre

Hermon

Glogue

Pembrokeshire

SA36 0DS

692.

17/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 066 – SAB

  •  New Dwelling

Land Opposite 58-62 Lawrenny Street

Neyland

SA73 1TD

693.

10/09/2024

Darren Thomas

Highways Act 1980 – Section 38 Final Certificate

  •  Michaels Walk

Cosheston

694.

19/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 058 – SAB

  •  Proposed Parking and Footway

Porthgain

Pembrokeshire

SA62 5BL

695.

19/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 064 – SAB

  •  Replacement Dwelling

Bier Hill Farm

The Ridgeway

Manorbier

SA70 8LG

696.

18/09/2024

Darren Thomas

Consent request to Proceed to Advert

  •  40mph A478 Pentregalar 40mph Speed Limit

 

697.

23/09/2024

Darren Thomas

Tower Hill RSF – Contract Award

  •  Evan Pritchard Ltd

698.

24/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 064 – SAB

  •  Memorial Garden

Parc Gwyn Crematorium

Narberth

Pembrokeshire

SA67 8UD

699.

25/09/2024

Darren Thomas

ATC Contract Award – St Dogmaels Ground Investigation Assessment and Report

  •  WSP (UK)

700.

25/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 067 – SAB

  •  Residential Development

70A – 80A Charles Street

Milford Haven

Pembrokeshire

SA73 2HE

701.

26/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 069 – SAB

  •  Covered Slurry Store

Blaendyfryn Gwyn Farm

Boncath

Pembrokeshire

SA37 0JT

702.

26/09/2024

Darren Thomas

SAB Permission Schedule 3 to the Flood & Water Management Act 2010 – 24- 075 – SAB

  •  Nutrient Store Roof

Clun Farm

Boncath

Pembrokeshire

SA37 0JY

 

Previous Decisions 2011 - 2019

Previous Decisions 2019 - 2023

 

 

 

ID: 544, revised 23/10/2024
Print