Building Control

Building Control Charges and Guidance

With effect from 5 May 2025

 

1.Before you carry out building work, you must ensure that the necessary Application / Notice is submitted to the Authority.

2. If you have entered into an agreement with your agent regarding payment of charges this would be a private matter between the applicant and the agent. Regularisation charges is payable by the applicant.

3. Charges are payable as follows:

Full plans application

  • Plan Charge, covers the examination and passing or rejection of the plans. Payable when the Application is deposited and
  • Inspection Charge, covers the inspection of work to which the plan relates, this is payable after the first inspection.

A full plans application must be submitted for building work to commercial premises, apartments and HMO’s

Building notice charge

  • One off payment, payable in full when the application is submitted.

Regularisation charge

  • Covers the cost of assessing your Application, including all the inspections necessary. This is payable upon submission of the Application. The charge payable is the amount equal to the total Building Notice charge (excluding VAT), plus 50%

Reversion charge

  • Payable on the first occasion the plans are deposited with the Authority.

4. In certain cases the Authority may agree for the inspection charges to be paid in instalments.

5. You may choose if you wish, to pay the inspection charge up front with the plan charge at application stage.

6. Where plans have been either approved or rejected, no further charge is payable on resubmission for substantially the same work.

7. A charge is not required if the work is to provide means of access, or facilities for a disabled person(s), in relation to an existing building to which members of the public are admitted, or an existing dwelling which is, or is to be, occupied by a disabled person. In order to be reasonably satisfied, Pembrokeshire County Council Building Control will seek to be provided with one of the following proofs of disability:

a) A copy of a Disability Facilities Grant (DFG) form from the Local Authority
b) A copy of an Occupational Therapists (OT) report stating that the works proposed are required in order for the disabled person(s) to continue living within their existing dwelling. This must state that the works are solely for the use of the disabled person(s).

In some circumstances partial fee remission may be given in the event that part of a project relates solely for the use of the disabled person(s) but another part does not.

Each application is assessed on its individual merits but either of the above proofs will be required. A GP letter may suffice in exceptional circumstances but proof of disability benefits alone cannot be used to claim fee remission.

 

Payment can be made online - Pay for Building Regulations application

Cheques should be made payable to ‘Pembrokeshire County Council’.

 

These notes are for guidance only and do not substitute for Statutory Instrument 2010 No. 404, which contains the full statement of the law.

 

Table A: Construction or conversion to new housing

 

Dev category

Number of dwellings

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Building notice charge

Building notice VAT 

Building notice total

A1

1

175.00

35.00

210.00

529.17

105.83

635.00

704.17

140.83

845.00

A2

2

275.00

55.00

330.00

820.83

164.17

985.00

1095.83

219.17

1315.00

A3

3

354.17

70.83

425.00

1058.33

211.67

1270.00

1412.50

282.50

1695.00

A4

4

433.33

86.67 

520.00

1291.67

258.33

1550.00

1725.00

345.00 

2070.00 

A5

5

508.33

101.67 

610.00 

1529.17 

305.83 

1835.00 

2037.50 

407.50 

2445.00 

A6

6

587.50

117.50 

705.00 

1762.50 

352.50 

2115.00 

2350.00 

470.00 

2820.00 

A7

7

666.67

133.33 

800.00 

2000.00 

400.00 

2400.00 

2666.67 

533.33 

3200.00 

A8

8

745.83

149.17 

895.00 

2233.33 

446.67 

2680.00 

2979.17 

595.83 

3575.00 

A9

9

825.00

165.00 

990.00 

2466.67 

493.33 

2960.00 

3291.67 

658.33 

3950.00 

A10

10

904.17

180.83 

1085.00 

2704.17 

540.83 

3245.00 

3608.33 

721.67 

4330.00 

A11

11

979.17

195.83 

1175.00 

2941.67 

588.33 

3530.00 

3920.83 

784.17 

4705.00 

A12

12

1037.50

207.50 

1245.00 

3116.67 

623.33 

3740.00 

4154.17 

830.83 

4985.00 

A13

13

1100.00

220.00 

1320.00 

3291.67 

658.33 

3950.00 

4391.67 

878.33 

5270.00 

A14

14

1158.33

231.67 

1390.00 

3466.67 

693.33 

4160.00 

4625.00 

925.00 

5550.00 

A15

15

1216.67

243.33 

1460.00 

3645.83 

729.17 

4375.00 

4862.50 

972.50 

5835.00 

A16

16

1275.00

255.00 

1530.00 

3820.83 

764.17 

4585.00 

5095.83 

1019.17 

6115.00 

A17

17

1333.33

266.67 

1600.00 

3995.83 

799.17 

4795.00 

5329.17 

1065.83 

6395.00 

A18

18

1391.67

278.33 

1670.00 

4175.00 

835.00 

5010.00 

5566.67 

1113.33 

6680.00 

A19

19

1450.00

290.00 

1740.00 

4350.00 

870.00 

5220.00 

5800.00 

1160.00 

6960.00 

A20

20

1508.33

301.67 

1810.00 

4529.17 

905.83 

5435.00 

6037.50 

1207.50 

7245.00 

 

For more than twenty dwellings please contact Building Control on 01437 764551

New dwellings over 300m2 – charges to be calculated based on estimated cost.

 

Table B: Small domestic buildings, extensions, alterations and loft conversions

Dev category

Type of work

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Building notice charge

Building notice VAT 

Building notice total

B1

Erection or Extension of a garage less than 100m²

470.83

94.17

565.00

Included in plan charge

Included in plan charge

Included in plan charge

470.83

94.17

565.00

B5

Conversion of a garage to a habitable room

470.83

94.17

565.00

Included in plan charge

Included in plan charge

Included in plan charge

470.83

94.17

565.00

B10

Single Storey Extension less than 10m²

116.67

23.33

140.00

354.17

70.83

425.00

470.83

94.17

565.00

B11

Single Storey Extension 10m² - 40m²

158.33

31.67

190.00

470.83

94.17

565.00

629.17

125.83

755.00

B12

Single Storey Extension 40m² - 100m²

195.83

39.17 

235.00 

587.50 

117.50 

705.00 

783.33 

156.67 

940.00 

B20

Two Storey Extension less than 40m²

175.00

35.00 

210.00 

529.17 

105.83 

635.00 

704.17 

140.83 

845.00 

B21

Two Storey Extension 40m² - 100m²

216.67

43.33 

260.00 

645.83 

129.17 

775.00 

862.50 

172.50 

1035.00 

B30

Alterations to create or extend a basement <100m²

158.33

31.67 

190.00 

470.83 

94.17 

565.00 

629.17 

125.83 

755.00 

B35

Loft Conversions

158.33

31.67 

190.00 

470.83 

94.17 

565.00

629.17 

125.83 

755.00 

B40

Underpinning

100.00

20.00 

120.00 

291.67

58.33 

350.00 

391.67 

78.33 

470.00 

B45

Renovation of a Thermal Element

158.33

31.67 

190.00 

Included in plan charge

Included in plan charge

Included in plan charge

158.33

31.67 

190.00 

B50

Installation of solar panels / photovoltaics

158.33

31.67 

190.00 

Included in plan charge

Included in plan charge

Included in plan charge

158.33

31.67 

190.00 

B60

Windows/Glazed Door Replacement <20 windows

158.33

31.67 

190.00 

Included in plan charge

Included in plan charge

Included in plan charge

158.33

31.67 

190.00 

B61

Windows/Glazed Door Replacement >20 windows

233.33

46.67 

280.00 

Included in plan charge

Included in plan charge

Included in plan charge

233.33

46.67 

280.00 

 

Reference to floor area relates to the cumulative internal floor area of all storeys.

Multiple work. Where plans show more than one extension to a private dwelling, the aggregate internal floor area may be used to determine charges payable, and the relevant charge made in accordance with table B. (If over 100m2, please ring Building Control on 01437 764551 for advice.)

 


Table B: Small domestic buildings, extensions, alterations and loft conversions: electrical work

Electrical Work

Type of work

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Building notice charge

Building notice VAT 

Building notice total

B70

Carried out by electrical contractor issuing BS7671 certificate

87.50

17.50 

105.00 

Included in plan charge

Included in plan charge

Included in plan charge

87.50

17.50 

105.00 

B71

Carried out by others

691.67

138.33 

830.00 

Included in plan charge

Included in plan charge

Included in plan charge

691.67

138.33 

830.00 

 

 Table C: Domestic Alterations to a Single Building (works not covered in table B)

Dev category

Internal alterations & installation of fittings

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Building notice charge

Building notice VAT 

Building notice total

C1

Less than £2000

158.33

31.67 

190.00 

Included in plan charge

Included in plan charge

Included in plan charge

158.33

31.67 

190.00 

C2

£2000 - £5000

100.00

20.00 

120.00 

291.67 

58.33 

350.00 

391.67 

78.33 

470.00 

C3

£5000 - £15,000

116.67

23.33 

140.00 

354.17 

70.83 

425.00 

470.83 

94.17 

565.00 

C4

£15,000 - £25,000

137.50

27.50 

165.00 

412.50 

82.50 

495.00 

550.00 

110.00 

660.00 

C5

£25,000 - £50,000

158.33

31.67 

190.00 

470.83 

94.17 

565.00 

629.17 

125.83 

755.00 

C6

£50,000 - £75,000

216.67

43.33 

260.00 

645.83 

129.17 

775.00 

862.50 

172.50 

1035.00 

C7

£75,000 - £100,000

254.17

50.83 

305.00 

766.67 

153.33 

920.00 

1020.83 

204.17 

1225.00 

C8

£100,000 - £150,000

312.50

62.50 

375.00 

941.67 

188.33 

1130.00 

1254.17 

250.83 

1505.00 

C9

£150,000 - £200,000

354.17

70.83 

425.00 

1058.33 

211.67 

1270.00 

1412.50 

282.50 

1695.00 

 

For projects with an estimated cost over £200,000 please contact us for advice.

Total estimated cost – This means a reasonable estimate that would be charged by a professional builder, but excluding professional fees and VAT.

 

Table D: Non Domestic Work - extensions and new build: Industrial and Storage

Dev. category

Extensions and new build

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Regularisation charge - Total

D1

Floor Area <40m²

208.33

41.67 

250.00 

500.00 

100.00 

600.00 

1062.50 

D2

Floor Area 40m² - 100m²

262.50

52.50 

315.00 

600.00 

120.00 

720.00 

1293.75 

D3

Floor Area 100m² - 200m²

379.17

75.83 

455.00 

879.17 

175.83 

1055.00 

1887.51 

 

 

Table D: Non Domestic Work - extensions and new build: Other

Dev. category

Extensions and New Build

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Regularisation charge - Total

D10

Floor Area <40m²

262.50

52.50 

315.00 

600.00 

120.00 

720.00 

1293.75 

D11

Floor Area 40m² - 100m²

333.33

66.67 

400.00 

766.67 

153.33 

920.00 

1650.00 

D12

Floor Area 100m² - 200m²

450.00

90.00 

540.00 

1041.67 

208.33 

1250.00 

2237.51 

 

 


Table E: Non Domestic Work Alterations

Dev. Category

 Type of work

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Building notice charge

Building notice VAT 

Building notice total

Regularisation charge - Total

E1

Underpinning <£50,000

116.67

23.33 

140.00 

354.17 

70.83 

425.00 

470.83 

94.17 

565.00 

706.25 

E2

£50,000 - £100,000

158.33

31.67 

190.00 

470.83 

94.17 

565.00 

629.17 

125.83 

755.00 

943.75 

E3

£100,000 - £250,000

195.83

39.17 

235.00 

591.67 

118.33 

710.00 

787.50 

157.50

945.00 

1181.25 

E10

Window Replacement <20

237.50

47.50 

285.00 

Included in plan charge

Included in plan charge

Included in plan charge

 237.50

47.50 

285.00 

356.25 

E11

Window Replacement >20

316.67

63.33 

380.00 

Included in plan charge

Included in plan charge

Included in plan charge

 316.67

63.33 

380.00 

475.00 

E20

New Shop Fronts <20 Windows

100.00

20.00 

120.00 

295.83 

59.17 

355.00 

395.83 

79.17 

475.00 

593.75 

E21

New Shop Fronts >20 Windows

116.67

23.33 

140.00 

354.17 

70.83 

425.00 

470.83 

94.17 

565.00 

706.25 

 

 

Dev. Category

Renovation of a Thermal Element

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Building notice charge

Building notice VAT 

Building notice total

Regularisation charge - Total

E30

 <£50,000

316.67

63.33 

380.00 

Included in plan charge

Included in plan charge

Included in plan charge

316.67

63.33 

380.00 

475.00 

E31

£50,000-£100,000

395.83

79.17 

475.00 

Included in plan charge

Included in plan charge

Included in plan charge

395.83

79.17 

475.00 

593.75 

E32

£100,000 - £250,000

470.83

94.17 

565.00 

Included in plan charge

Included in plan charge

Included in plan charge

470.83

94.17 

565.00 

706.25 

 

 

Dev. Category

Alterations and Fittings

Full plan application - Plan charge 

Full plan application - VAT

Full plan application - Total

Full plan application - Inspection charge

Full plan application inspection charge - VAT

Full plan application inspection charge - Total

Regularisation charge - Total

E40

<£5,000

145.83

29.17 

175.00 

325.00 

65.00 

390.00 

706.25 

E41

£5,000 - £15,000

162.50

32.50 

195.00 

387.50 

77.50 

465.00 

825.00 

E42

£15,000 - £25,000

208.33

41.67 

250.00 

500.00 

100.00 

600.00 

1062.50 

E43

£25,000 - £50,000

245.83

49.17 

295.00 

541.67 

108.33 

650.00 

1181.25 

E44

£50,000 - £75,000

308.33 

61.67 

370.00 

712.50 

142.50 

855.00 

1531.25 

E45

£75,000 - £100,000

400.00

80.00

480.00

933.33

186.67 

1120.00 

2000.00 

E46

£100,000 - £150,000

445.83

89.17 

535.00 

1045.83 

209.17 

1255.00 

2237.50

E47

£150,000 - £250,000

495.83

99.17 

595.00 

1154.17 

230.83 

1385.00 

2475.00 

E48

£250,000 - £350,000

541.67

108.33 

650.00 

1262.50 

252.50 

1515.00 

2706.25 

E49

£350,000 - £500,000

595.83

119.17 

715.00 

1366.67 

273.33 

1640.00 

2943.75 

E50

Mezzanine Floor <500m²

216.67

43.33 

260.00 

491.67 

98.33 

590.00 

1062.50 

E60

Office Fit Out <500m²

191.67

38.33 

230.00 

437.50 

87.50 

525.00 

943.75 

E61

Office Fit Out 500m² - 2000m²

258.33

51.67 

310.00 

604.17 

120.83 

725.00 

1293.75 

E70

Shop Fit Out <500m²

191.67

38.33 

230.00 

437.50 

87.50 

525.00

943.75 

E71

Shop Fit Out 500m² - 2000m²

262.50

52.50 

315.00 

600.00 

120.00 

720.00 

1293.75 

 

  

 